Professional services

A fee proposal is a scope document that happens to have a number on it.

The risk in an engineering proposal is not the fee, it is the sentence that quietly commits you to a second round of calculations you did not price. Firms manage that with language refined over years — standard of care, deliverables, what triggers additional services — and then retype it from whichever past proposal looked closest. The Proposal Maker reads the proposals your firm has already issued and drafts the next one from them.

Start with your own proposals10 proposals free for 30 days

Where this fits

You already run Deltek Vantagepoint, OpenAsset or Word templates. This is not that.

The gap

Deltek runs the accounting, the resource plan and the pipeline. OpenAsset holds the project photography and the staff resumes. Between them sits the actual writing, which in most firms is still a principal opening the last similar proposal in Word, saving a copy and editing it — which is exactly why an old client's name occasionally survives into a new submission.

What this does not do

This is not a practice management or accounting system. Deltek keeps the timesheets, the project accounting and the pipeline. This drafts the proposal document, from the proposals your firm has already issued.

Scope

What a engineering firm's proposal actually has to itemise

  • Scope of services by phase, whether schematic through construction administration or a study-only engagement
  • Deliverables named as artefacts: drawings at a stated sheet count, calculations, specifications, reports, letters
  • Level of effort by discipline and grade, where the client expects to see the hours behind the fee
  • Site visits and meetings, with the number included and the rate for additional ones
  • Submittal and RFI review, capped at a stated quantity or duration, which is where uncompensated time accumulates
  • Coordination with other consultants, and what you are relying on them to provide
  • Assumptions the fee depends on: available survey, geotechnical report, as-built drawings, client-furnished data

Pricing

How engineering firms price the work

Lump sum fee

A fixed fee against a defined scope, with the phases and the deliverables that fee covers itemised so additional services are visibly additional.

Hourly against a rate schedule

Billing rates by grade with an estimated total or a not-to-exceed, and the escalation date if the engagement runs past a year.

Percentage of construction cost

A percentage basis with the construction cost estimate it is calculated on, and how the fee adjusts if that estimate moves.

Phased with authorisation gates

Each phase priced separately and authorised in writing before it starts, so the client controls commitment and you control exposure.

The document

What comes out the other end

  1. 01Project understanding, which demonstrates you read the RFP and is often the only section a selection committee scores
  2. 02Scope of services by phase, with deliverables stated as nouns rather than activities
  3. 03Fee and basis of compensation, including the rate schedule and reimbursable expense treatment
  4. 04Schedule, expressed in weeks from notice to proceed rather than calendar dates that expire
  5. 05Exclusions and additional services, listing what will be charged separately if requested
  6. 06Client responsibilities: data, access, timely decisions, and the consequence of delay
  7. 07Assumptions the fee is predicated on, stated explicitly enough to support a change in fee
  8. 08Standard of care and limitation of liability, in the wording your professional liability carrier has approved

Compliance

The details that belong on the document, not in a follow-up email

  • Professional engineer licence numbers and the states of registration relevant to the project location
  • Firm certificate of authorisation, which many states require before a firm may offer engineering services
  • Standard of care worded as the ordinary skill of engineers practising under similar conditions, and never as a guarantee, since a warranty is typically outside professional liability coverage
  • Limitation of liability and indemnity provisions consistent with what your carrier underwrote
  • Seal and signature responsibility identified, including which deliverables are sealed and by whom
  • Reliance limited to the named client, which matters when a report reaches a lender or a buyer

General guidance, not legal advice. Requirements vary by state and jurisdiction — confirm yours with counsel or your licensing board.

Straight answers

The three things you are probably thinking

Our proposal language took fifteen years to get right. I am not letting AI rewrite it.

It does not rewrite it. Language you have settled with your carrier goes into the firm profile and is reproduced verbatim. What it drafts is the project-specific scope, which is the part you retype anyway.

Public agency RFPs have rigid formats.

They do, and the response has to follow their outline. Upload the agency responses you have already submitted and the draft follows that structure rather than a generic one.

A principal has to review it regardless. Where is the saving?

In the two hours between the inquiry and the draft that principal reviews. Review does not go away and should not — the drafting does.

FAQ

Engineering proposals: common questions

Which disciplines does this suit?

Structural, civil, MEP, geotechnical and environmental all work the same way, because the document structure is common across them. What differs is the deliverable vocabulary, which it learns from your own library.

Can it respond to a formal public RFP?

It drafts against the outline you give it, so if the agency prescribes a structure the response follows it. Upload past agency submissions and the match improves.

How is our standard of care wording protected?

It lives in your firm profile and is reproduced exactly. Contractual language your carrier approved is never paraphrased.

Does it estimate our fee or hours?

No. Fee and level of effort are professional judgement and stay with the firm. It writes the scope, the exclusions and the basis of compensation around the number you set.

Can it read an RFP and pull out the requirements?

Yes. Upload the RFP as a PDF and it extracts project details, deliverables and dates as editable fields you confirm before drafting starts.

See what it writes from your last engineering proposal.

Upload three or four you were happy to send. The next one drafts in the same voice.